Our mission
To develop and operate facilities, to ensure People and safety and property and to preserve the environment and the regions.
SHEM is also
- 54 fully-equipped drops,
- 55 main water intakes,
- 51 secondary water intakes,
- 185 km of tunnels and delivery pipes,
- 24 surge tanks and water chambers,
- 67 km of pressure pipelines,
- 6 service cable cars and cable transporters,
- 102 turbines of different types,
- 5 pumps,
- 170 turbine wheels or pumps,
- 61 alternotors,
- 39 generators,
- 25 HVA/HVB stations,
- 147 trip switches,
- 200 programmable robots.


